A.shall
B.should
C.may
D.would
您可能感興趣的試卷
你可能感興趣的試題
A.a marine chemist
B.the Officer in Charge,Marine Inspection
C.the Master or person in charge of the ship
D.the National Fire Protection Association
A.to be carried out
B.carry out
C.be carried out
D.will carry out
A.of
B.for
C.with
D.in
A.18 months
B.2 years
C.3 years
D.5 years
A.to
B.of
C.for
D.about
最新試題
In order to withstand fluid head pressure on a ship,stiffeners are often attached to the bulkhead().
The annual survey for endorsement of a Load Line Certificate must be held within().
Please arrange the survey()early.
At()an occasional survey has been carried out.
Should the vessel have no deratisation certificate at the time of her delivery,she()be held to be unseaworthy.
During fueling,all doors,hatches,and ports().
I saw the cargo surveyor()the cargo on deck just a minute ago.
The conclusion is()the said ship is fit to continue to sail.
The lines led forward from the bow and aft from the stern when a vessel is moored to the dock are().
The burden of proving unseaworthiness is upon those who()it.