單項(xiàng)選擇題The carrier is entitled to()overboard goods which are dangerous.

A.though
B.thought
C.throw
D.through


您可能感興趣的試卷

你可能感興趣的試題

2.單項(xiàng)選擇題The carrier can obtain()for loss caused to him by the shipper stating the particulars of the goods inaccurately.

A.an indemnity
B.liability
C.responsibility
D.possibility

4.單項(xiàng)選擇題If the Shipowner fails to give the Charterer the notice of readiness to load,and delay in commencing to load is thereby caused,the Charterer will (),as he is not bound to look out for the ship.

A.be responsible
B.not be responsible
C.pay the Shipowner for the expenses incurred
D.not claim the Shipowner for the expenses incurred

最新試題

If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.

題型:?jiǎn)雾?xiàng)選擇題

A breach of the()undertaking of seaworthiness at the port of loading entitles the Charterer to refuse to load.

題型:?jiǎn)雾?xiàng)選擇題

()is not within the exception of the perils of the sea.

題型:?jiǎn)雾?xiàng)選擇題

The object of the both-to-blame collision clause is().

題型:?jiǎn)雾?xiàng)選擇題

The merchant shall have the goods properly()and accurately and clearly()before shipment.

題型:?jiǎn)雾?xiàng)選擇題

Freight rates are mostly charged().

題型:?jiǎn)雾?xiàng)選擇題

When the Captain of the Port or Officer in Charge,Marine Inspection issues an order of suspension to the operator of a vessel concerning oil transfer operations,it().

題型:?jiǎn)雾?xiàng)選擇題

If the Shipowner fails to give the Charterer the notice of readiness to load,and delay in commencing to load is thereby caused,the Charterer will (),as he is not bound to look out for the ship.

題型:?jiǎn)雾?xiàng)選擇題

]If a charter-party,although for two consecutive voyages,is held to be one indivisible contract,a deviation on the first voyage entitles the Charterer to treat the breach as a repudiation of()contract.

題型:?jiǎn)雾?xiàng)選擇題

If the Charterer nominates an unsafe port and the ship is damaged through going there,() will be liable for the damage,subject to that the master acts reasonably in going there.

題型:?jiǎn)雾?xiàng)選擇題