A.welding brackets across both ends of the crack
B.chipping out and slot welding the entire crack
C.drilling a hole at each end of the crack
D.cutting a square notch at each end of the crack
您可能感興趣的試卷
你可能感興趣的試題
A.breaking the fire chemical chain reaction
B.smothering
C.cooling
D.isolating the heat from the fuel
A.quantity of fuel to be received
B.flash point of the fuel as it is received
C.fuel temperature as it is received
D.viscosity of the fuel being received
A.close the static leg filling valve
B.close the overflow tank falling valve
C.reduce the fuel oil pumping rate
D.stop the fuel oil pumping operation
A.The pressure-vacuum relief valve should be reset
B.The tanks should be made seaworthy to prevent contamination
C.The tanks should be sounded to make sure the levels are not rising
D.The tanks should be marked with a bull stamp on the manifold filling valve
A.hose joints are made up
B.tanks are being topped off
C.system is being lined up
D.pumping operation is first started
最新試題
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
If separating effect is not good, which measure should be taken ()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
The ISPS Code consists of a mandatory section-Part A, which shows()
To proceed to the assistance of a ship in distress is()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The main purpose of port State control is not to()