A.sounding the tank
B.waiting for the vessel to list
C.examining tank boundaries
D.checking fuel oil strainers
您可能感興趣的試卷
你可能感興趣的試題
A.on the outgoing tide
B.overboard after dark
C.overboard through an oily water separator
D.anytime in an emergency, i-emain engine lube oil failure
A.drained into the vessels bilges
B.reclaimed for other uses
C.held in a slop tank
D.purified and then reused
A.when the remaining charge volume is less than 90 percent of the required VOLUME
B.at each inspection for certification
C.at each annual inspection
D.when the weight loss exceeds 10% of weight of charge
A.welding brackets across both ends of the crack
B.chipping out and slot welding the entire crack
C.drilling a hole at each end of the crack
D.cutting a square notch at each end of the crack
A.breaking the fire chemical chain reaction
B.smothering
C.cooling
D.isolating the heat from the fuel
最新試題
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
The ISPS Code consists of a mandatory section-Part A, which shows()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The condensers located in various stages of a flash evaporator are cooled by()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
If separating effect is not good, which measure should be taken ()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.