A.facilitate speed of recovery during the weighing process
B.indicate the anchor's location to passing or mooring ships
C.prevent damage to the stern in the event of a headwind
D.provide a steady platform for the gangway between the fantail and pier
您可能感興趣的試卷
你可能感興趣的試題
A.spring tide
B.flood tide
C.ebb tide
D.slack water
A.swing wide and approach the pier so as to land starboard side to
B.approach the pier on a parallel course at reduced speed
C.make your approach at a greater angle than in calm weather
D.point the vessel's head well up into the slip and decrease your speed
A.The vessel will not reverse direction in a tidal current
B.The radius of the vessel's swing will be shortened
C.A mooring approach may be made from any direction
D.The vessel will not swing with a change in wind
A.soft mud
B.sand
C.silt
D.soft to firm clays
A.avoid any swing in a restricted space
B.shelter the ship from strong winds
C.prevent from touching with other vessels
D.make a convenience of cargo discharging
最新試題
Pilotage in this country is().
You are planning to anchor in an area where several anchors have been lost due to fouling.As a precaution,you should().
When weighing anchor in a rough sea,how would you avoid risk of damaging the bow plating ().
When anchoring,good practice requires 5 to 7 fathoms of chain for each fathom of depth. In deep water you should use().
You are proceeding down a channel and lose the engine(s).You must use the anchors to stop the ship.Which statement is true().
The centre of lateral resistance is().
If the winch should fail while you are hauling in the anchor,what prevents the anchor cable from running out().
That()is not caused by shallow water.
A check line is().
You are mooring to a buoy.You should approach the buoy with the current from().