A.running rigging leading aft from the masts
B.running rigging leading forward from the masts
C.standing rigging leading aft from the masts
D.standing rigging from the cross trees to the mast head
您可能感興趣的試卷
你可能感興趣的試題
A.including
B.besides
C.except
D.in addition to
A.hoisting cargo aboard a vessel
B.hoisting personnel aboard a vessel
C.securing a small boat to a large vessel
D.hoisting the anchor
A.slipway
B.graving dock
C.ground warp
D.caisson dock
A.Moving high weights lower
B.Adding weight at the tipping center
C.Moving a weight forward
D.Moving lower weight high
最新試題
Where is the most probable location of the remote shutdown station for cargo pumps on a tank barge carrying oil().
Which part provides for transverse control and positioning of a boom in a conventional yard and stay system().
Which of the following statement(s)is/are TRUE regarding a twin pedestal crane set().
Which of the following statements is FALSE concerning cranes being installed on the centerline of vessels().
Sudden starts or stops of the boom is likely to cause all of the following except().
Which part of a conventional cargo gear rig provides for vertical control and positioning of a boom().
Which method should be used to warm up the pump turbines prior to discharge().
They()loading at 1400 hours.
Which statement comparing a shipboard crane to conventional gear is TRUE().
How should you signal the crane operator to move slowly().