A.alkale scence
B.acidity
C.salinity
D.impurity
您可能感興趣的試卷
你可能感興趣的試題
A.stop the LO pump, SW pump, FW pump
B.stop the priming FO transfer pump
C.engage the turning gear
D.open the scavenge air belts drain valve and cover the turbocharger silencer with the dustproof cover
A.keep all systems in normally running
B.the main engine is stand-by
C.shut off the starting air bottle outlet valve
D.pay attention to the changes of the system parameters
A.fuel valve
B.the starting air valve
C.the sea chest
D.the main sea pump inlet valve
A.shut off the starting air receiver outlet valve
B.stop the FO priming transfer pump and shut off the correspondence inlet and outlet valve
C.stop the SW pump immediately and shut off the correspondence inlet and outlet valve
D.stop the FW pump immediately and shut off the correspondence inlet and outlet valve
A.overload
B.the odds of the load
C.the default of parts
D.overload and the odds of the load
最新試題
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
() is not installed on the main switchboar.
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
Diesel engine air start system check valves are opened by ()
The condensers located in various stages of a flash evaporator are cooled by()
Which of the following items don’t belong to dock repair works?()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.