A.generator sets running trial
B.shafting intensity trial
C.the trail for pumps that working for ME
D.ME safety devices trial
您可能感興趣的試卷
你可能感興趣的試題
A.starting and direction changing trial
B.cancelling accelerating function trial
C.lowest stable speed trial
D.continuous running trial
A.chief engineer
B.surveyor
C.the engineer
D.the technique personnel of the shipyard
A.chief engineer
B.the engineer
C.captain
D.any member of the engine department
A.releasing the boiler water
B.the explosion detecting and cleaning for the fuel tank
C.the docking project related item
D.shore power and fire fighting water supply
A.igniting boiler
B.releasing air in sea water system
C.starting generator
D.cut off shore power
最新試題
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
The main purpose of port State control is not to()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
Which of the following items don’t belong to dock repair works?()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
The shipboard oil pollution emergency plan will be invalid after ()
Using a file without a handle may result in ()
The ISPS Code consists of a mandatory section-Part A, which shows()