A.Contain the oil and remove as much of it as possible from the water
B.Throw chemical agents on the water to disperse the oil
C.Throw sand on the water to sink the oil
D.Obtain your permit from the Corps of Engineers
您可能感興趣的試卷
你可能感興趣的試題
A.unit method
B.block method
C.straight method
D.package method
A.Hydraulic oil
B.Water-antifreeze mixture
C.Distilled water
D.Oil from the cargo
A.Make three tucks with full strands,remove half the wires from each strand,and make two more tucks
B.Make four tucks in each strand,cut away every other strand,and make two more tucks with each remaining strand
C.Make four tucks with each full strand
D.Make six tucks with each strand,removing a few wires from each strand as each additional tuck is made
A.soon or late
B.soon or later
C.sooner or late
D.sooner or later
A.In due course
B.On time
C.In time
D.Swiftly
最新試題
The foreman says that the stevedores stopped working owing to the()of the winch.
The()provides a rapid means of tallying when items of the same commodity are being loaded or unloaded in uniform drafts consisting of an equal number of pieces.
Foreman,the ship(),please get the stevedores to fill the port wings with heavier packages.
()is not an advice be observed when samples are taken in tanks containing volatile petroleum products.
Therefore you are requested to arrange()for the above mentioned amount of additional cargo to be loaded on board.
Please tell your tallymen to()out the marks in the holds during discharging.
The payment proportionate to the part of the voyage accomplished or to the part of the cargo delivered is referred as().
The cargo,when(),should be completely covered with plastic.
The Captain of the Port has closed to navigation,and buoyed,a section of a harbor. These buoys would be painted().
The force acting on a single cargo runner which is vertically lifting or lowering a load is greatest when().