A.unit method
B.block method
C.straight method
D.package method
您可能感興趣的試卷
你可能感興趣的試題
A.Hydraulic oil
B.Water-antifreeze mixture
C.Distilled water
D.Oil from the cargo
A.Make three tucks with full strands,remove half the wires from each strand,and make two more tucks
B.Make four tucks in each strand,cut away every other strand,and make two more tucks with each remaining strand
C.Make four tucks with each full strand
D.Make six tucks with each strand,removing a few wires from each strand as each additional tuck is made
A.soon or late
B.soon or later
C.sooner or late
D.sooner or later
A.In due course
B.On time
C.In time
D.Swiftly
A.loosely
B.closely
C.heavily
D.strongly
最新試題
The Tally Fees will be settled()my Shipowner()the agents.
The()provides a rapid means of tallying when items of the same commodity are being loaded or unloaded in uniform drafts consisting of an equal number of pieces.
The cargo,when(),should be completely covered with plastic.
The inability to supply a cargo of the contractual quantity in the country of shipment()the doctrine of frustration into operation.
The cargo is liable to burn.Please keep it()the engine room.
When general cargo with different amounts in each draft is involved,the checker must use the ().
When oil is accidentally discharged into the water,what should you do after reporting the discharge().
Which cargo is considered volatile().
The ship will be responsible for the cargo loaded or unloaded().
You are transporting dangerous cargo on your vessel.You must inspect this cargo().