A.need
B.need not
C.will
D.to
您可能感興趣的試卷
你可能感興趣的試題
A.be responsible
B.not be responsible
C.pay the Shipowner for the expenses incurred
D.not claim the Shipowner for the expenses incurred
A.in the loading place
B.in the port or dock
C.in the loading spot
D.in the discharging spot
A.he
B.she
C.the owner
D.the shipper
A.broken space
B.dead weight
C.constant
D.dead freight
A.a part of
B.the whole
C.3/4th of
D.1/2nd of
最新試題
Both the Shipowner and the Charterer will be discharged from their obligations under the charter-party if it()frustrated.
()is not within the exception of the perils of the sea.
A breach of the()undertaking of seaworthiness at the port of loading entitles theCharterer to refuse to load.
The object of the both-to-blame collision clause is().
If the Shipowner fails to give the Charterer the notice of readiness to load,and delay in commencing to load is thereby caused,the Charterer will (),as he is not bound to look out for the ship.
If the state of the goods at the time they were handed over to the consignee has been the subject of a joint survey or inspection by the parties,notice in writing()be given of loss or damage ascertained during such survey or inspection.
The merchant undertakes that no claim or allegation shall be made against any servant,agent or subcontractor of the carrier which()to impose upon any of them or any liability whatsoever in connection with the goods.
If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
A vessel is not in every way fitted for cargo service()at the time of her delivery to the charterers her engine room staff is incompetent and inadequate,and accordingly she is unseaworthy.
According to Gencon,if at any time during the currency of this Charter,both Owners and Charterers are unable to arrange bunkers at the main bunkering ports for the voyage in question,the()to have the privilege of canceling this Charter.