A.the subject
B.the project
C.the inject
D.the deject
您可能感興趣的試卷
你可能感興趣的試題
A.where
B.whether
C.there
D.and
A.the office staff
B.the terminal staff
C.the ship's crew
D.the insurance company
A.heavy
B.easily damaged
C.affected by temperature
D.costly relative to the strength ratio
A.is more flexible and has the ability to absorb shock because of its weight
B.is less subject to wear and damage from abrasion
C.requires little maintenance
D.All of the above
A.has financial backing to meet any liability resulting from the discharge of oil
B.has the minimum required amount of P & I and hull insurance
C.will assume the responsibility for any damage or loss to the shipper
D.has financial reserves to meet reasonable expected crew costs of an intended voyage
最新試題
Vessels lying afloat at buoys for more than 24 hours should use anchor chain for()and insurance wire for().
The disadvantage(s) of using web lashing on light vehicles aboard Ro-Ro vessels is that it().
Sue and Labor is to()a loss which would be recoverable under PICC Hull Insurance Clauses.
No jettison of cargo shall be made fair as()unless such cargo is carried in accordance with the recognized custom of the trade.
Which of the following would be considered downflooding on a fishing vessel as defined in regulation? ()
The ship owner’s liability for cargo damage is covered under what marine insurance policy?().
When the carrier is liable for the compensation in respect of loss of or damage to the goods,such compensation shall be calculated on the basis of the Merchant’s net invoice cost,plus freight and insurance premium,if paid. This sentence means that().
The wooden plug inserted in the vent of a damaged tank should be removed if you are going to ().
What is considered a Serious Marine Incident? ()
On an OSV,when may a work vest be substituted for a required life jacket?()