單項選擇題Consideration should be given in planning for the mooring orientation in a new location so that in adverse weather a crane is available to off-load the supply vessel on what side of the unit?().

A.Weather side
B.Leeward side
C.Upwind side
D.Crosswind side


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題Chafing gear should be placed().

A.at all wearing points of mooring lines
B.at the bitter ends of all standing rigging
C.around running rigging
D.on wire rope only

2.單項選擇題By paying out more anchor cable,you().

A.decrease the holding power of your anchor
B.decrease the swing of your vessel while at anchor
C.increase the holding power of your anchor
D.increase the possibility that your vessel will drag anchor

3.單項選擇題Before letting the anchor go,you should check that the().

A.chain is clear
B.anchor is clear of obstructions
C.wildcat is disengaged
D.All of the above

4.單項選擇題Anchoring and fishing in this area are().

A.danger
B.dangerous
C.dangerously
D.dangering

5.單項選擇題An example of an anchor which has a stock is a().

A.Bruce anchor
B.Dunn anchor
C.Hook anchor
D.LWT anchor