A.takes
B.comes
C.goes
D.gives
您可能感興趣的試卷
你可能感興趣的試題
A.terminal operator
B.owner of the barge
C.tankerman or person in charge of loading
D.charterer through the Master of the towing vessel
A.is not
B.is
C.does not
D.can hardly be
A.the Shipowner's
B.the Charterer's
C.the cargo owner's
A.The Charterers should sing new bunker contract with oil chandlers
B.The Charterers can use the bunker contracts signed by the Owners with oil chandlers
C.The Charterers shall not sign bunker contracts with oil chandlers
D.The Charterers shall sign bunker contracts with oil chandlers
A.has the form of a
B.forms
C.is in the form of a
D.is to form a
最新試題
If the Shipowner proves that prima facie the cause of damage was excepted,the burden ofproof shifts to().
The cargo must be loaded within the time stipulated by the charter-party,otherwise the Charterer will have to pay().
To render the()liable,the shipowners must show that the proximate cause of the detention or expense was trading to a river with a bar or to a port with a bar.
If the Shipowner makes an innocent misrepresentation which induces the Charterer to sign the contract,the Charterer may be entitled to()the charter-party.
In modern times,the work of stowage is generally deputed to stevedores,but that does not generally relieve the shipowners()their duties even though the stevedores are,under the charter-party,to be appointed by the Charterers.
The master’s authority to act in the interests of the cargo owner is part of his general authorityas servant of the Shipowner,and therefore()will be liable if the master abuses his powers.
The Charterers to have option of using Owners’ bunker contracts. This sentence indicates that().
The S.S. Hollowpoint has a charter party in which the charterer assumes no responsibility for the operation of the vessel but pays stevedoring expenses. What is the name of the charter party? ().
Unless otherwise agreed,()must take the goods from alongside,though this obligation may be varied by a custom of the port which is not inconsistent with the express terms of the contract.
We must take the Charterer’s benefit()full consideration.